Project Location : Mwanza,Tanzania

Supervision of Upgrading of Usagara – Kisesa [Mwanza bypass] Road [16 km] to bitumen standard

 

 

Project Specifications

Project Name :
Supervision of Upgrading of Usagara – Kisesa [Mwanza bypass] Road [16 km] to bitumen standard
Country :
TANZANIA
Project Location :
Mwanza,Tanzania
Professional staff provided by your firm :
3
Name of the Client :
Tanzania Road Agency [TANROADS]
No. Staff :
5
No. of Staff-Months :
120
Start Date :
2013-07-10
Approximate Finish Date :
2016-12-31
Approximate value of services in USD :
1,254,235 USD
Approximate value of services in USD :
1,254,235 USD
Name of Associated Consultant, if any :
AARVEE Associates Architects Engineers & Consultants PVT LTD [India]
Name of Senior Staff [Project Director/Coordinator, Team Leader] involved and function performed
1. Mr. Gerald Maregesi – Pavement/Materials Specialist
2. Mr. Boniphace Elias – Structure Engineer
3. Mr. onesmo Mgoha – Chief Surveyor

Description

The project involves construction of 16 km of road from Kisesa – Usagara the aim being to bypass the Mwanza town so alleviating the traffic congestion. The road is being upgraded from gravel formed road to bitumen standards. The road has numerous hydraulic structure including one Brigde:

Nyashishi Bridge – 67.95 m long bridge with 3 spans

Advanced Engineering Solution is in charge of:

Preparation and approval of Quality control and quality assurance plan
Bridge design review
Review of geometrical and profile design
Supervision of construction of drainage structures such as bridge, box culverts and pipe culverts
Review of pavement design
Mix design of stabilized material and cement concrete
Approval of all construction materials such subgrade [G7 and G15], stabilized subbase [C1], crushed base [CRR], surface dressing and Marshal asphalt concrete.
Preparation of monthly report
Reviewing and approving Contractor’s quality assurance plan
Implementation of contractor’s environmental management plan