Project Location : Ruvuma, Tanzania

Upgrading of Songea – Namtumbo Road to Bitumen Standard [67 km]

 

 

Project Specifications

Project Name :
Upgrading of Songea – Namtumbo Road to Bitumen Standard [67 km]
Country :
TANZANIA
Project Location :
Ruvuma, Tanzania
Professional staff provided by your firm :
1. Materials/pavement specialist
2. Quality control Manager
3. Chief surveyor
Name of the Client :
Millennium Challenge Tanzania Account MCA-T
No. Staff :
3
No. of Staff-Months :
36
Duration of Assignment :
12 Months
Start Date :
2010-06-08
Approximate Finish Date :
2011-08-02
Approximate value of services in USD :
270,000 USD
Approximate value of services in USD :
270,000 USD
Name of Senior Staff [Project Director/Coordinator, Team Leader] involved and function performed
1. Mr. Gerald Maregesi – Pavement/Materials Specialist
2. Mr. Maximillian Omundu – Quality Control Manager
3. Chief Surveyor – Stephan Mashauri

Description

Advanced Engineering Solution was selected by the Contractor as an independent Engineer specifically for running the technical department of main Contractor [SOGEA SATOM], the project involved upgrading of Songea – Namtumbo road to bitumen standard [67 km], the major work involved placing earthworks G3 material, improved lower subgrade material G7, improved upper subgrade layer G15, stabilized subbase C1, placing crushed stone base CRR and double surface dressing.

Advanced Engineering Solution is in charge of:

Preparation of d approval of Quality control and quality assurance plan
Implementation of Contractor’s quality control plan
Detailing engineering surveying for quantity computation as well as means of quality control for checking the elevation as well as position of the alignment [X,Y,Z]
Geotechnical investigation prior to bridge construction
Review of pavement design/mechanistic pavement design
Geometrical design review and improvement for the geometrical features of the alignment.
Preparation of various technical reports and correspondences including claims and value engineering proposal.
Preparation of monthly report
Management of laboratory which includes management of laboratory test and filed tests such field density, concrete quality control test etc.
Management of surveying department which was dealing with rolling out quantity from the cross section, preparation of drawings,