Project Location : Mwanza, Tanzania

Supervision of Construction of Mabatini Pedestrian Flyover [steel] Bridge in Mwanza Region

Project Specifications

Project Name :
Supervision of Construction of Mabatini Pedestrian Flyover [steel] Bridge in Mwanza Region
Project Location :
Mwanza, Tanzania
Start Date :
2013-03-06
Approximate Finish Date :
2013-09-18

Description

The project involves supervision of construction of pedestrian overpass steel bridge with I-beam section, universal column and hollow steel section light.

Advanced Engineering Solution is in charge of:

Preparation and approval of Quality control and quality assurance plan
Approval of concrete mix design used for foundation construction
Supervision of erection of all bridge members
Approval of all construction materials such steel members, bolts and concrete
Detailing engineering survey for checking the elevation as well as the location of the bridge structure
Geotechnical investigation prior to construction of the bridge
Preparation of monthly report
Reviewing and approving Contractor’s quality assurance plan
Preparation of traffic management plan
Implementation of contractor’s environmental management plan